top of page
Search

Project Completion: Coating Works on the West Gate Tunnel, Melbourne VIC

  • ATD Info Team
  • Aug 7
  • 2 min read

Attention to Detail (ATD) is pleased to announce the successful completion of our painting and protective coating works on the West Gate Tunnel project in Melbourne, Victoria—one of the most significant infrastructure developments currently reshaping the city’s transport network.

The West Gate Tunnel is a critical link in Melbourne’s road system, designed to reduce congestion on the West Gate Bridge, provide a vital second river crossing, and improve access to and from the western suburbs. ATD was engaged to complete a specialised coatings scope focused on durability, safety, and compliance with the highest industry standards.


Our Scope of Works

ATD was responsible for the full surface preparation and coating of the tunnel’s emergency egress doors—an essential safety element of the overall tunnel system. Our works included:

  • Precision substrate grinding and surface preparation to ensure proper adhesion and performance of the protective system.

  • Application of Dulux Group’s anti-carbonation coatings, selected specifically for their durability, moisture resistance, and long-term protection against environmental pollutants and carbonation.

Working within a highly controlled and high-risk infrastructure environment, our team executed all works in accordance with strict occupational health and safety requirements, environmental standards, and project timelines.



The Importance of Anti-Carbonation Coatings

In tunnel environments, infrastructure elements are continuously exposed to a combination of moisture, vehicle emissions, and fluctuating temperatures. These conditions can lead to carbonation—where carbon dioxide penetrates concrete surfaces, reducing the pH level and leading to corrosion of embedded steel reinforcement.

The use of anti-carbonation coatings is critical in protecting surfaces from this process. The system applied by ATD was specifically engineered to reduce permeability, protect structural integrity, and extend the service life of the tunnel components, particularly those that serve a vital safety function, such as the egress doors.



Supporting Infrastructure at Scale

As part of our broader portfolio of major infrastructure works, this project further reinforces ATD’s capabilities in delivering specialist coating solutions for high-profile civil projects. We understand the stringent demands of infrastructure environments and apply systems and processes that ensure long-term performance, minimal maintenance, and compliance with project-specific technical specifications.

From detailed surface prep to the final coat, every step of our process is aligned with our commitment to precision, safety, and quality delivery.


ree

Get in Touch

ATD continues to support Tier 1 contractors, government projects, and private developers with expert coatings and finishes across Australia’s infrastructure, commercial, industrial, and public sectors.

To learn more about our infrastructure capabilities or to speak to our estimating team, contact us at:📧 estimating@attentiontodetail.com.au🌐 www.atdpaint.com.au

 
 
 

Comments


bottom of page